ACR-14.04v1.0

Production promotion gates SHALL require defined testing, review, and approval before any change rea

Eval Method

EI+ATEI+AT

Risk Weight

4 / 10

Applicability

L1L2L3

Description#

Production promotion gates SHALL require defined testing, review, and approval before any change reaches production.

Evaluation Method#

EI+ATEI+AT

Evaluation methodology as specified by the assigned method code.

v1.1 Details#

Profile Applicability

F,S,A,C

Evaluation Frequency

Annual

Platform Cert Eligible

No

Framework Crosswalk Refs

NIST SP 800-53 CM-3; NIST SP 800-218

Classification#

Conditional Control

This is a conditional control. Non-compliance with this ACR may result in conditional certification with a mandated remediation period. The Authorized Verification Body will specify the remediation timeline and required evidence for the condition to be cleared. If remediation is not completed within the specified period, the conditional certification will be revoked.