The Risk Classification Report SHALL be delivered to the deploying organization and to ARAF as part
Eval Method
EI+OPEI+OPRisk Weight
4 / 10Applicability
Description#
The Risk Classification Report SHALL be delivered to the deploying organization and to ARAF as part of the certification evidence package. The organization SHALL sign acknowledgment of the assigned Assurance Class before certification is granted.
Evaluation Method#
Evaluation methodology as specified by the assigned method code.
v1.1 Details#
Profile Applicability
S,A,C
Evaluation Frequency
At-Certification
Platform Cert Eligible
No
Framework Crosswalk Refs
ARA Standard v1.1 §4.2; ARAF Risk Classification Framework
Classification#
This is a conditional control. Non-compliance with this ACR may result in conditional certification with a mandated remediation period. The Authorized Verification Body will specify the remediation timeline and required evidence for the condition to be cleared. If remediation is not completed within the specified period, the conditional certification will be revoked.