ACR-10.23v1.0
The system SHALL log all configuration changes with the previous value, new value, change source, an
Eval Method
AT+CMAT+CMRisk Weight
4 / 10Applicability
L1L2L3
Description#
The system SHALL log all configuration changes with the previous value, new value, change source, and timestamp.
Evaluation Method#
AT+CMAT+CM
Evaluation methodology as specified by the assigned method code.
v1.1 Details#
Profile Applicability
F,S,A,C
Evaluation Frequency
Continuous
Platform Cert Eligible
No
Framework Crosswalk Refs
NIST SP 800-53 CM-3; AU-3
Classification#
Conditional Control
This is a conditional control. Non-compliance with this ACR may result in conditional certification with a mandated remediation period. The Authorized Verification Body will specify the remediation timeline and required evidence for the condition to be cleared. If remediation is not completed within the specified period, the conditional certification will be revoked.