ACR-10.18v1.0
Alert fatigue mitigation SHALL be implemented through intelligent alert grouping, deduplication, and
Eval Method
EI+ATEI+ATRisk Weight
3 / 10Applicability
L1L2L3
Description#
Alert fatigue mitigation SHALL be implemented through intelligent alert grouping, deduplication, and escalation.
Evaluation Method#
EI+ATEI+AT
Evaluation methodology as specified by the assigned method code.
v1.1 Details#
Profile Applicability
A,C
Evaluation Frequency
At-Certification
Platform Cert Eligible
No
Framework Crosswalk Refs
NIST SP 800-53 SI-4
Classification#
Conditional Control
This is a conditional control. Non-compliance with this ACR may result in conditional certification with a mandated remediation period. The Authorized Verification Body will specify the remediation timeline and required evidence for the condition to be cleared. If remediation is not completed within the specified period, the conditional certification will be revoked.