ACR-10.11v1.0

Log collection latency SHALL NOT exceed defined maximum delay from event occurrence to log availabil

Eval Method

ATAutomated Testing

Risk Weight

3 / 10

Applicability

L1L2L3

Description#

Log collection latency SHALL NOT exceed defined maximum delay from event occurrence to log availability.

Evaluation Method#

ATAutomated Testing

Compliance is evaluated through automated test suites that exercise the control under structured test conditions. Results are deterministically reproducible.

v1.1 Details#

Profile Applicability

A,C

Evaluation Frequency

At-Certification

Platform Cert Eligible

No

Framework Crosswalk Refs

NIST SP 800-53 AU-4

Classification#

Conditional Control

This is a conditional control. Non-compliance with this ACR may result in conditional certification with a mandated remediation period. The Authorized Verification Body will specify the remediation timeline and required evidence for the condition to be cleared. If remediation is not completed within the specified period, the conditional certification will be revoked.