ACR-10.04v1.0

Real-time anomaly alerts SHALL be generated for boundary violations, unusual patterns, and operation

Eval Method

AT+CMAT+CM

Risk Weight

4 / 10

Applicability

L1L2L3

Description#

Real-time anomaly alerts SHALL be generated for boundary violations, unusual patterns, and operational anomalies.

Evaluation Method#

AT+CMAT+CM

Evaluation methodology as specified by the assigned method code.

v1.1 Details#

Profile Applicability

F,S,A,C

Evaluation Frequency

Continuous

Platform Cert Eligible

No

Framework Crosswalk Refs

NIST SP 800-53 SI-4; NIST AI RMF Manage 4.1

Classification#

Conditional Control

This is a conditional control. Non-compliance with this ACR may result in conditional certification with a mandated remediation period. The Authorized Verification Body will specify the remediation timeline and required evidence for the condition to be cleared. If remediation is not completed within the specified period, the conditional certification will be revoked.