ACR-1.27v1.0

Material changes to the platform (new model version, architectural change, dependency version change

Eval Method

EI+OPEI+OP

Risk Weight

3 / 10

Applicability

L1L2L3

Description#

Material changes to the platform (new model version, architectural change, dependency version change) SHALL trigger re-evaluation of affected ACRs. The vendor SHALL define and document the threshold for "material change" prior to Platform Certification.

Evaluation Method#

EI+OPEI+OP

Evaluation methodology as specified by the assigned method code.

v1.1 Details#

Profile Applicability

F,S,A,C

Evaluation Frequency

Annual

Platform Cert Eligible

Yes

Framework Crosswalk Refs

ARAF Platform Cert Specification v1.0

Classification#

Conditional Control

This is a conditional control. Non-compliance with this ACR may result in conditional certification with a mandated remediation period. The Authorized Verification Body will specify the remediation timeline and required evidence for the condition to be cleared. If remediation is not completed within the specified period, the conditional certification will be revoked.