The system SHALL detect drift in error rates, latency patterns, and resource consumption profiles.
Eval Method
CMContinuous MonitoringRisk Weight
3 / 10Applicability
Description#
The system SHALL detect drift in error rates, latency patterns, and resource consumption profiles.
Evaluation Method#
Compliance is evaluated through analysis of continuous monitoring telemetry collected over a defined observation period during live or simulated operations.
Evidence Requirements#
The following evidence artifacts must be provided to demonstrate compliance with this control:
Level Applicability#
| Level | Applicable | Implication |
|---|---|---|
| L1 | No | Not evaluated at L1. This control applies at higher certification levels only. |
| L2 | No | Not evaluated at L2. |
| L3 | No | Not evaluated at L3. |
Classification#
This is a conditional control. Non-compliance with this ACR may result in conditional certification with a mandated remediation period. The Authorized Verification Body will specify the remediation timeline and required evidence for the condition to be cleared. If remediation is not completed within the specified period, the conditional certification will be revoked.