ACR-4.13v1.0
Permission changes SHALL require multi-party authorization for high-impact operations.
Eval Method
AT+EIRisk Weight
4 / 10Applicability
L1L2L3
Description#
Permission changes SHALL require multi-party authorization for high-impact operations.
Evaluation Method#
AT+EI
Evidence Requirements#
The following evidence artifacts must be provided to demonstrate compliance with this control:
Level Applicability#
| Level | Applicable | Implication |
|---|---|---|
| L1 | No | Not evaluated at L1. This control applies at higher certification levels only. |
| L2 | No | Not evaluated at L2. |
| L3 | No | Not evaluated at L3. |
Classification#
Conditional Control
This is a conditional control. Non-compliance with this ACR may result in conditional certification with a mandated remediation period. The Authorized Verification Body will specify the remediation timeline and required evidence for the condition to be cleared. If remediation is not completed within the specified period, the conditional certification will be revoked.