ACR-14.25v1.0

If the deploying organization materially changes the system's operational context in a manner that w

Eval Method

EI+OP

Risk Weight

4 / 10

Applicability

L1L2L3

Description#

If the deploying organization materially changes the system's operational context in a manner that would increase the Risk Classification (e.g., expanding from internal to customer-facing deployment, adding life-safety use cases, or entering a regulated domain), the organization SHALL notify ARAF and the evaluating AVB within 14 days. The AVB SHALL conduct a Risk Classification reassessment to determine whether the Assurance Class must be elevated.

Evaluation Method#

EI+OP

Evidence Requirements#

The following evidence artifacts must be provided to demonstrate compliance with this control:

    Level Applicability#

    LevelApplicableImplication
    L1NoNot evaluated at L1. This control applies at higher certification levels only.
    L2NoNot evaluated at L2.
    L3NoNot evaluated at L3.

    Classification#

    Conditional Control

    This is a conditional control. Non-compliance with this ACR may result in conditional certification with a mandated remediation period. The Authorized Verification Body will specify the remediation timeline and required evidence for the condition to be cleared. If remediation is not completed within the specified period, the conditional certification will be revoked.